Question: Consider a five job two machine flowshop scheduling problem. The processing times for the five jobes are JI ( 2 7 , 2 0 )

Consider a five job two machine flowshop scheduling problem. The processing times for the five jobes are JI (27,20)J2(12,9)J3(11,10). J4(8,13) and J5(4.16). Find the makespan for the sequence J1-J3-J5-J4-J2? Also find the sequence that has minimum makespan?