Question: Consider a production line consisting of two single - machine stations. The operational characteristics of these two stations are as follows: Attribute Station 1 Station
Consider a production line consisting of two singlemachine stations. The
operational characteristics of these two stations are as follows:
Attribute Station Station
tmin min
c
MTTF hrs hrs
MTTR hrs hrs
cr
Answer the following questions:
i Which station is the effective bottleneck of the line?
ii Can the line sustain a production rate of parts over an eighthour shift?
iii. Suppose that parts are released to the line in a deterministic manner, with
constant interrelease times, and the resulting mean cycle time at Station
CT is equal to hours and minutes. What is the length of the interrelease
intervals?
i
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
