Question: Consider a production line with four stations in continuous order 1-2-3-4. Station 1 has three identical machines, each of which can produce 4 units/min. Station

Consider a production line with four stations in continuous order 1-2-3-4. Station 1 has three identical machines, each of which can produce 4 units/min. Station 2 can produce 8 units/min. Station 3 has two simultaneous lines: one line has two CONTINUOUS machines (one follows the other) and each of them produces 9 units/min and 6 units /min respectively; the other line has only one machine producing 8 units/min. Station 4 can produce 12 units/ min.

  1. a) Which station is the bottleneck station?
  2. b) What is the system cycle time?
  3. c) What is the system process time and capacity?
  4. d) What if another parallel machine of station 1 is added? Will this improve the system and why?
  5. e) If the machine line operates 10 hour a day and 4 days a week, then what is the weekly capacity of the process.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!