Question: Consider a two-objective minimisation problem solved by NSGA-II generating the following combined parent/offspring population (objective values shown for all 16 members, i.e. M1~M16) at

Consider a two-objective minimisation problem solved by NSGA-II generating the following combined parent/offspring population (objective values shown for all 16 members, i.e. M1~M16) at one of the iterations: Table Q5 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 f1 6.0 6.0 5.0 6.0 6.0 5.0 2.0 10.0 6.0 8.0 4.0 9.0 6.0 8.0 4.0 9.0 8.0 3.0 7.0 1.0 3.0 1.5 f2 8.0 4.0 6.0 8.0 4.0 6.0 8.0 5.0 0.5 3.0 9.0 7.0 6.0 1.0 9.0 2.0 20 70 7.0 1.5 What is the size of the population at the end of each iterations?
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
