Question: Consider a workstati time per job ach in parallel ) , each requiring one hour of 1 1 machines per for with c e 2
Consider a workstati
time per job ach in parallel each requiring one hour of machines per for with Each machine costs $ Orders for jobs arrive at a rate of per hour with and must be filled. Management has specified a maximum allowable average response time ie time a job spends at the station of hours. Currently it is just over hours check it
Analyze the following options for reducing average response time.
a Perform more preventive maintenance so that and are reduced, but remains the same. This costs $ and does not improve the average process time but does reduce to one.
b Add another machine to the workstation at a cost of $ The new machine is identical to existing machines, so and
c Modify the existing machines to make them faster without changing the SCV at a cost of $ The modified machines would have and
What is the best option?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock