Question: Consider a workstation with 1 1 machines ( in parallel ) each requiring one hour of process time per job with scv of c 2

Consider a workstation with 11 machines (in parallel) each requiring one hour of process
time per job with scv of c2e
=5. Each machine costs $10; 000. Orders for jobs arrive
at a rate of 10 per hour with scv of 1 and must be lled. Management has specied a
maximum allowable average response time (i.e., time a job spends at the station) of 2
hours. Currently it is just over 3 hours (check it).
Analyze the following options for reducing average response time.
a) Perform more preventive maintenance so that mr and mf are reduced, but mr=mf
remains the same. This costs $8; 000 and does not improve the average process
time but does reduce the scv of processing time c2e
to one.
b) Add another machine to the workstation at a cost of $10; 000. The new machine
is identical to existing machines, so te =1 and c2e
=5.
c) Modify the existing machines to make them faster without changing the scv, at
a cost of $8; 500. The modied machines would have te =0:96 and c2e
=5.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!