Question: Consider an Electronic Assembly/Testing System as shown in the figure. The figure also gives the relevant data. Part A Prep Rework Scrapped 20% Part A

Consider an Electronic Assembly/Testing System as

Consider an Electronic Assembly/Testing System as shown in the figure. The figure also gives the relevant data. Part A Prep Rework Scrapped 20% Part A EXPO(5) Sealer 80%. TRIA(1,4,8) 7% EXPO(45) Salvaged and Shipped Arrivals Part B Prep 93% Part B Batches of 4 EXPO(30) Part A TRIA(1,3,4) Part B WEIB(2.5,5,3) Shipped TRIA(3,5,10) *use single Process module for modeling the Sealer Develop an ARENA model and run it for five days of 8-hours shifts (40 replications) to obtain the following results: 1. Utilization of all Resources. 2. Average total time in the system for parts A and B in the system. 3. Average waiting time and average number in queue for all Queues. Note: The report should include: 1- An MS-WORD file contains the answers for the above questions, 2- The ARENA model file (i.e. *****.doe)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!