Question: Consider an Erlang loss system. The average processing time is 3.5 minutes. The average interarrival time is 7 minutes. The number of servers is 4

Consider an Erlang loss system. The average

Consider an Erlang loss system. The average processing time is 3.5 minutes. The average interarrival time is 7 minutes. The number of servers is 4 . What is the average number of occupied servers? Sable 17.1.pdf 96KB A. 0.242 B. 0.4992 C. 0.725 D. 1.450