Question: Consider any ongoing Indian metro construction project. Provide work break down structure (WBS) up to 2 level and find the following. List of activities Duration
Consider any ongoing Indian metro construction project. Provide work break down structure (WBS) up to 2 level and find the following.
- List of activities
- Duration of Each Activities
- Cost associated with each activity
- Duration of Project
- Major Risk Identified in the Project ( Upto 5 Risk Maximum)