Consider Project Theta, its time line of cash flows, and one of the project IRRs: Year...................0..............1...............2...........IRR Cash Flow.....($200).....$850.......($700).......15% What is the best decision for Project Theta (accept or reject) if the project’s required rate of return is 15% and why?
a. | Reject the project because the NPV is less than zero | |
b. | Accept the project because the IRR is greater than zero | |
c. | Accept the project because the NPV is greater than zero | |
d. | Accept the project because the payback is short | |
e. | Reject the project because the IRR is less than the required rate of return |