Question: Consider the assembly line balancing problem represented by the network in next figure. Determine a balance for C = 20 sec. using the Longest Task

Consider the assembly line balancing problem represented by the network in next figure. Determine a balance for C = 20 sec. using the Longest Task Time technique.

Consider the assembly line balancing problem

D 8 B 4 10 A H K 5 12 3 1 J F 8 2 a) Minimal Number of Stations: b) Longest Task Time sequence: c) Tasks in station 1: d) Idle time in station 2: e) Tasks in station 3