Question: Consider the Data Flow Graph ( DFG ) below. Assuming that the multiplication takes 2 - time units, and the addition takes 1 time unit,

Consider the Data Flow Graph (DFG) below.
Assuming that the multiplication takes 2-time units, and the addition takes 1 time unit, your task is to:
- identify the loops
- The iteration period bound (IPB)
- calculate the critical path
- draw a retimed diagram to reduce the critical path delay.
Consider the Data Flow Graph ( DFG ) below.