Question: Consider the following ijobs single machine scheduling problem, with the jobs atributes shown in the table wow. Job 1 2 S PJ 13 7 12

Consider the following ijobs single machine
Consider the following ijobs single machine scheduling problem, with the jobs atributes shown in the table wow. Job 1 2 S PJ 13 7 12 10 7 11 B 16 13 10 0 0 Anth peeps allowed, find Optimal schedule that times the total not C Tatim Consider the following ijobs single machine scheduling problem, with the jobs atributes shown in the table wow. Job 1 2 S PJ 13 7 12 10 7 11 B 16 13 10 0 0 Anth peeps allowed, find Optimal schedule that times the total not C Tatim