Question: - Consider the following net requirements. The setup cost for the production is $500 and the holding cost is $1.2 per component per week. Week

- Consider the following net requirements. The

- Consider the following net requirements. The setup cost for the production is $500 and the holding cost is $1.2 per component per week. Week Net requirement 1 400 2 150 3 350 4 600 5 100 Total 1600 Show the production plan for (a) push, (b) JIT, and (c) hybrid push-pull systems