Question: 8 . 2 Consider the following net requirements. The setup cost for the production is $ 5 0 0 and the holding cost is $

8.2 Consider the following net requirements. The setup cost for the production is $500
and the holding cost is $1.2 per component per week.
Show the production plan for (a) push, (b) JIT, and (c) hybrid push-pull systems.