Question: Consider the system X shown below with a reliability of 66.53%. The reliability of each process is listed at the top of the box. Components

Consider the system X shown below with aConsider the system X shown below with a

Consider the system X shown below with a reliability of 66.53%. The reliability of each process is listed at the top of the box. Components A and B are attached separately. Component C comes in a container (E) and has a backup (D). Component F is a backup if E fails. A, B, and E (or F) have to working order for the system to work. 90% 84 60% B 40% F (backup) 50% D (backup) E Suppose that a new streamlined system Y could be designed that consists of only one component (G) with a backup (H). The component's (cheaper) backup (H) would be twice as likely to fail as the primary component (G) itself. What would be the reliability of H? (Note: the new system Y replaces the old system X and both have the same reliability) O A. 16.81% O B. Cannot be determined OC. 12.81% OD 12.18% O E. 18.18% OF. 16.18% O G. 81.81%

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!