Question: Consider the Table below, Network Diagram Data for a Small Project. All duration estimates or estimated times are in days; and the network proceeds from

Consider the Table below, Network Diagram Data for a Small Project. All duration estimates or estimated times are
in days; and the network proceeds from Node 1 to Node 9.
Draw an AOA network diagram representing the project. Put the node numbers in circles and draw arrows from
node to node, labeling each arrow with the activity letter and estimated time. Also, what is the critical path for this
project and how long is it?