Question: continuation problem and another question PROBLEMS 1. Given the following data, compute the production standard (pieces per hour), the standard labor cost per 100 pieces,

continuation problem

and another question

PROBLEMS 1. Given the following data, compute the production standard (pieces per hour), the standard labor cost per 100 pieces, and the standard hours per 100 pieces. The allowances are 4% for fatigue, 8% for unavoidable delays, and 8% for personal needs. The operator is paid $5.00 per hour. Performance rating = 105%. (Instructor: Look also at Problem 12.) Reading (min) 2 3 4 Element 1 1 2 3 4 0.020 0.002 0.100 0.205 0.010 0.003 0.110 0.195 0.009 0.004 0.009 0.200 0.012 0.004 0.050 0.210 chapter. . ent on 12. Redo Problem 1 if the performance rating was 90%. Discuss the change and the role of performance rating. observations, so 10. In conducting a work sampling study, you find the following results. Graph the results and from that visually estimate how many more readings will be required. Number of Observations Accumulated % 50 60 70 80 34 26.5 32.5 28
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
