Question: Continuing with the projeto in problem 1 Te var Tm Tp 9 To 3 2 7 A un 11 00 m 11 8 12 21

Continuing with the projeto in problem 1 Te var
Continuing with the projeto in problem 1 Te var Tm Tp 9 To 3 2 7 A un 11 00 m 11 8 12 21 3 6 4 9 G NO 6 11 4 4 G 4 7 ACTIVITY PREDECESSOR 4 B A C A D B 3 DE B 7 1 F C 13 2 G D,E,F 5 3 H G 41 G 9 5) 4 6 K HI, K 5 7 8 9 1. for each task calculate the Te (two decimal points) 20 21 22 2. determine the estimated time of completion for the project 23 24 25 3. determine the task variance for each task 26 27 28 4. calculated the project variance 29 30 31 5. calculate the project standard deviation 32 33 34 6. calculate the completion time with a 95% confidence (z score = 1.645)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer