Question: Create a network scheduling diagram for the following scenario. Project Title: TAMU-C Monorail System Structure: Steel-frame rail system with concrete piers as required to support
Create a network scheduling diagram for the following scenario.
Project Title: TAMU-C Monorail System Structure: Steel-frame rail system with concrete piers as required to support monorail cars with minimum capacity of 30 people per monorail car.
Location/Orientation: Each contractor is to provide a campus map with layout of monorail train station locations and presenting a proposed monorail route. At a minimum, the monorail should have stations at Whitley Hall, What-a-Burger, the McDowell Administration building, Memorial Stadium, and the RSC. Additional stations may be proposed to ensure adequate travel support for students and visitors. Train stations: Stations should include covered entry and exits to shield travelers from the elements.
Time Frame: Physical construction may commence on June 1 and must be completed within 12 months.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
