Question: Create a risk register template in MS Excel using these specifications: Table 8.2 (Raydugin, 2013, p.186-189). It should resemble Figure 5.3 (Raydugin, 2013, p.144) with

Create a risk register template in MS Excel using these specifications:

Table 8.2 (Raydugin, 2013, p.186-189).

It should resemble Figure 5.3 (Raydugin, 2013, p.144) with all fields specified as in Table 8.2.

Populate the risk register with the two risks you selected from Assignment 3.

Given the following values, which option should be selected for the transmission line problem discussed in this module? Detailed chart below