Question: Make a risk register template in MS Excel using these specifications: Table 8.2 (Raydugin, 2013, p.186-189). It should resemble Figure 5.3 (Raydugin, 2013, p.144) with
Make a risk register template in MS Excel using these specifications:
- Table 8.2 (Raydugin, 2013, p.186-189).
- It should resemble Figure 5.3 (Raydugin, 2013, p.144) with all fields specified as in Table 8.2.
- Populate the risk register with the two risks you selected from Assignment 3.
- Given thefollowingvalues, which option should be selected for the transmission line problemdiscussed in this module?Click herefor a detailed chart.