Question: create a simulation model and solve byy using the given data using Simio software A simple manufacturing system is staffed by 3 operators. Parts arrive

create a simulation model and solve byy using the given data using Simio software

A simple manufacturing system is staffed by 3 operators. Parts arrive according to a Poisson process with a mean rate of 2 per minute to a workstation for a drilling process at one of three identical drill presses. The parts wait in a single queue until a drill press is available. Each part has a particular number of holes that need to be drilled. Each hole takes a Lognormal time to be drilled with an approximate mean of 1 minute and a standard deviation of 30 seconds. Once the holes are drilled, the part goes to the grinding operation. At the grinding operation, one of the 3 available operators grinds out the burrs on the part. This activity takes approximately 5 minutes plus or minus 30 seconds. After the grinding operation, the part leaves the system.

Develop simio model for this situation. Report the average system time for the parts based on 20 replications of 4800 minutes.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!