Question: Create Work Breakdown Structure (WBS) Include at least 20 work packages. Consider all of the deliverables that are required to Construct a large, high-quality, custom
Create Work Breakdown Structure (WBS) Include at least 20 work packages.
Consider all of the deliverables that are required to Construct a large, high-quality, custom home within five months at $1.75 million like (Beautiful garden with balcony, Well-equipped kitchen, Driveway of 1500ft)
Break high-level deliverables into smaller deliverables, with the smallest being referred to as work packages