Question: Cumulative Average - Time Learning Curve average of $ 4 5 per hour. Required: engines, eight engines, sixteen engines, and thirty - two engines. (

Cumulative Average-Time Learning Curve average of $45 per hour.
Required: engines, eight engines, sixteen engines, and thirty-two engines. (Round hour answers to two decimal places.)
2. What is the total labor cost if Pohlman manufactures the following number of engines: one, four, or sixteen?
Cost for manufacturing one engine
Cost for manufacturing four engines