Question: D. (3.5 points) Complete the MPS numbers. Lot size is 40, safety stock is 10. 16 Week Sales plan 1 50 2 50 3 20

D. (3.5 points) Complete the MPS numbers. Lot
D. (3.5 points) Complete the MPS numbers. Lot size is 40, safety stock is 10. 16 Week Sales plan 1 50 2 50 3 20 4 15 5 15 30 Projected available balance Master production schedule