Question: Design a plug flow reactor ( PFR ) to remove a pollutant from a waste stream with a flow rate of 9 , 1 0
Design a plug flow reactor PFR to remove a pollutant from a waste stream with a flow rate of Lday Laboratory batch reactor tests indicate that the pollutant degrades according to a rate constant k day'. Regulations mandate that of the pollutant must be removed in the reactor before the waste stream is discharged.a What is the order n of the reaction kinetics?b What is the minimum hydraulic retention time for the PFRc What will be the PFR volume required to treat this waste stream?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock