Question: 6. Design a plug flow reactor (PFR) to remove a pollutant from a waste stream with a flow rate of 9,100 L/day. Laboratory batch reactor

 6. Design a plug flow reactor (PFR) to remove a pollutant

6. Design a plug flow reactor (PFR) to remove a pollutant from a waste stream with a flow rate of 9,100 L/day. Laboratory batch reactor tests indicate that the pollutant degrades according to a rate constant k = 0.27 day! Regulations mandate that 99.5% of the pollutant must be removed in the reactor before the waste stream is discharged. a. What is the order n of the reaction kinetics? b. What is the minimum hydraulic retention time for the PFR? c. What will be the PFR volume required to treat this waste stream

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Chemical Engineering Questions!