Question: Design a Primary Sedimentation Basin. The average flowrate at a small municipal wastewater - treatment plant is 2 7 , 0 0 0 m 3

Design a Primary Sedimentation Basin. The average flowrate at a small municipal wastewater-treatment plant is 27,000 m3/d. The highest observed peak daily flowrate is 77,000 m3/d. Design rectangular primary clarifiers with a channel width of 7 m. Use a minimum of two clarifiers. Calculate the scour velocity, to determine if settled material will become re-suspended. Estimate the BOD and TSS removal at average and peak flow. Use an overflow rate of 37 m3/m2.d at average flow and a side water depth of 3.7 m.
Use the following values:
Cohesion constant k =0.05
Specific gravity S =1.25
Acceleration due to gravity g =9.81 m/s2
Diameter of particles d =110 x 10-6 m
Darcy-Weisbach friction factor f=0.027

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!