Question: Design a Primary Sedimentation Basin. The average flowrate at a small municipal wastewater - treatment plant is 2 7 , 0 0 0 m 3
Design a Primary Sedimentation Basin. The average flowrate at a small municipal wastewatertreatment plant is md The highest observed peak daily flowrate is md Design rectangular primary clarifiers with a channel width of m Use a minimum of two clarifiers. Calculate the scour velocity, to determine if settled material will become resuspended. Estimate the BOD and TSS removal at average and peak flow. Use an overflow rate of mmd at average flow and a side water depth of m
Use the following values:
Cohesion constant k
Specific gravity S
Acceleration due to gravity g ms
Diameter of particles d x m
DarcyWeisbach friction factor f