Question: Design horizontal - flow rectangular sedimenation basins for a water treatment plant that must treat a flow of 2 0 0 million liters per day
Design horizontalflow rectangular sedimenation basins for a water treatment plant that must treat a flow of million liters per day MGD Since alum is used as a coagulant, an overflow rate of mh is appropriate. The minimum water temperature is oC
Your principal engineer recommends using basins. Justify this assumption and complete the problem assuming there will be basins.
Determine the basin plan area for each basin.
Using a hydraulic retention time of hours, find the depth of the basins.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock