Question: Design the most efficient screw pump for the following system: minimum sewage elevation in interceptor of 1 1 2 . 6 0 m , maximum

Design the most efficient screw pump for the following system: minimum sewage elevation in interceptor of 112.60m, maximum sewage elevation in interceptor of 112.80m, discharge elevation to stilling well of 116.40m, an average design flow of 8,600m3d, peaking factor for peak hour of 2.8 and minimum factor of 0.49. Use typical screw pump selection table (20-1).
Using a spreadsheet you developed, design a bar rack channel using an inlet channel width of 0.8m, slope of 0.04% and the discharge values given in Problem 4. Assume an approach velocity at average flow rate 0.4ms; approach velocity at peak hour flow rate at design capacity 0.9ms; two channels will be provided for redundancy, but one channel must handle the flow for the peak hydraulic flow rate. Use a freeboard of 0.6m.[note - the problem requires multiple PDF view on GradeScope of the formula, numerical data and any solver function used] NOTE: GradeScope only accepts PDFs, you will need to submit your working spreadsheet in CANVAS for full credit.
QUESTION 5 PLEASE
Design the most efficient screw pump for the

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!