Question: desired ouput should be 60 units and operating time should be 90 units 2 Balance the following assembly line. Primary Herbation with largest positional power
desired ouput should be 60 units and operating time should be 90 units
2 Balance the following assembly line. Primary Herbation with largest positional power Tie Breaker Herre Augustation with longest time Desired Outpur 90 units per hour Operating Time Onits per hour 1 1 What is the Cyde Time? te) What is the minimum number of workstation ? Which substations will be grouped to therineach station? d) What is the line officians? Revised Time Assign Time Workstation Remaining Eligible Task Remaining Station Idle Timo e . DACALERAS