Question: Details: Task 1 : Prepare an O&M plan for a 2 0 0 k W grid - connected rooftop solar PV system. There is a

Details:
Task 1: Prepare an O&M plan for a 200kW grid-connected rooftop solar PV system.
There is a 220kW DC/200kW AC PV system that has DC/AC ratio of 1.1. This system is made of 550PV module of 400W, and 450kW three phase inverter. Each inverters output are connected to a 300A rated panelboard using a 70A circuit breaker. The main 300A circuit breaker is connected to a disconnect switch and then the the point of connection on the line side of the service panel. The tithe angle of the modules are 10 degrees. Cables on the roof are running inside IMC conduits Invorters and panelboard are installed on the exterior wall of the building and disconnect swifch is installed inside the electrical room beside the service panel.
Prepare an 0&M plan for this system assuming that the system is installed in Ontario, Canada and the proyect lifetime is 25 years.
Your plan should reflect the key performance indicators (KPIs). Please justify your selected KPls.
 Details: Task 1: Prepare an O&M plan for a 200kW grid-connected

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!