Question: DETERMINE THE COST, BASE WH, LOCAL SELF PREFORM WH, AND THE TOTAL LABOR COST. Crew #2 Structural Steel Installation $50/hour self-perform rate 25 TN of
DETERMINE THE COST, BASE WH, LOCAL SELF PREFORM WH, AND THE TOTAL LABOR COST.
Crew #2 Structural Steel Installation $50/hour self-perform rate
25 TN of Pipe Rack Steel Installed 25 hours/TN PF of 1.6
40 LF of Ladders 5 hours/LF PF of 1.0
32 LF of Structural Steel Surface Prep & Painting 2.6 hours/SF PF of 1.2 Material Unit Cost - $3/SF
Galvanizing Sub Cost of $5500
| Total Cost ($) |
|
| Base WH |
|
| Local Self Perform WH |
|
| Total Labor Cost ($) |
|