Determine the elevation of the last point 2C from an existing bench mark, called (TBM (60.5)) using
Fantastic news! We've Found the answer you've been seeking!
Question:
Determine the elevation of the last point 2C from an existing bench mark, called (TBM (60.5)) using the figure and table below. Use the R&F method. Perform the page check and compute misclosure (closure error).