Question: Determine the expected unit cost of output, when the operator is assigned to 4 machines. The following data are known: operator rate = $ 1

Determine the expected unit cost of output, when the operator is assigned to 4 machines. The following data are known: operator rate = $ 12 per hour; machine rate = $ 20 per hour; average machine downtime per machine per hour =6 minutes; machine servicing time per unit =12 minutes; machine time per unit =45 minutes