Question: * ( i ) Determine the expected unit cost of output, when the operator is assigned four machines. The following data are known: Operator rate

*(i) Determine the expected unit cost of output, when the operator is assigned four machines.
The following data are known:
Operator rate=$12.00 per hour,
Machine rate =$20.00 per hour,
Average machine downtime per machine per hour =6 min.
Machine servicing time per unit =12 min,
Machine time per unit =45 min.
(ii) Why are performance rating and allowances considered important in stop-watch time study?
(iii) What approaches may be taken to overcome the problems of performance rating and allowances in industry?