Question: Develop a complete work breakdown structure for a small gas station project for which simplified plans and concept drawing are attached at the end of
Develop a complete work breakdown structure for a small gas station project for which simplified plans and concept drawing are attached at the end of this document .
Table 1 provides work units that need to be finished to complete the project.
Q- Develop work packages and include the respective work units as a secondary
level of the WBS.
Q- Develop a unique numeric tracking system for work packages and work units .
Q- Draw an AON diagram properly sequencing the construction of the primary work packages ( e.g 1st level of the WBS )
Attached Table 1 & 2
and complete Drawings






that is the way it was posted! kindly go ahead and answer please
Table 1: Work Units for the Gas Station Project (1) Earthwork for Parking Service (P&S) Area (11) Interior Painting (2) Asphalt Paving for P&S Area (12) Interior Drywall (3) Concrete Hardstands in P&S Area (13) Interior Doors, Frames, Hardware, etc. (4) Concrete Foundations (14) Interior Floor Coverings (if reqr'd) (5) Walls-Masonry Bearing Walls (15) Exterior Brick Faade (6) Walls-Prefab Metal Sandwich Panels (16) Exterior Glazing (7) Interior Concrete Floors (17) Exterior Doors and Signage (8) Built-up Roof (18) Mechanical Systems (9) Roof Gutters/Drainage (19) Electrical Systems (10) Interior Built-ins (e.s., Cabinets, etc.) Table 2: Mechanical Systems Individual Work Units (1) Excavation of waste water system (2) Drainage tile installation - waste water (3) Septic tank installation (4) Fresh water lines (piping) (5) Sinks, basins, and toilets installation (6) Hot water system installation (7) Pneumatic air system installation CATE ELLA LANCHE DOTBAL 19 +++ BLOG DOG Tree wified K units espective r pork 15 simplified pective Tos new Me TO re 994 ce M. .. RA TOR INTER to FOUNDATION ANCHOR DAT PAN. Ka PE VUORI NLP POE STURE ONE ME - contre les DwxMTE OM 2 RA NUSILLIP condiz TE Se BAN GRY NI Aid TRON THY RCORE Je UPLE Tree * M XUL DE LU MI IC and AL TO he RE C AN 45 PVE MUTUA FLOOR PLANI *NOX Da INNER ST WW TABRIA TRAC SCC- 45 1 HE * tre 1. 18 SCHNELS LE, Hi, (k ht ESCA E NELS *** INC.NRIS ** LOC Deum: TORTON TO THE STRA WAT IS WEB lo 3. KEMAL NA DUTC Ses 40 L SFP der . WALL Table 1: Work Units for the Gas Station Project (1) Earthwork for Parking Service (P&S) Area (11) Interior Painting (2) Asphalt Paving for P&S Area (12) Interior Drywall (3) Concrete Hardstands in P&S Area (13) Interior Doors, Frames, Hardware, etc. (4) Concrete Foundations (14) Interior Floor Coverings (if reqr'd) (5) Walls-Masonry Bearing Walls (15) Exterior Brick Faade (6) Walls-Prefab Metal Sandwich Panels (16) Exterior Glazing (7) Interior Concrete Floors (17) Exterior Doors and Signage (8) Built-up Roof (18) Mechanical Systems (9) Roof Gutters/Drainage (19) Electrical Systems (10) Interior Built-ins (e.s., Cabinets, etc.) Table 2: Mechanical Systems Individual Work Units (1) Excavation of waste water system (2) Drainage tile installation - waste water (3) Septic tank installation (4) Fresh water lines (piping) (5) Sinks, basins, and toilets installation (6) Hot water system installation (7) Pneumatic air system installation CATE ELLA LANCHE DOTBAL 19 +++ BLOG DOG Tree wified K units espective r pork 15 simplified pective Tos new Me TO re 994 ce M. .. RA TOR INTER to FOUNDATION ANCHOR DAT PAN. Ka PE VUORI NLP POE STURE ONE ME - contre les DwxMTE OM 2 RA NUSILLIP condiz TE Se BAN GRY NI Aid TRON THY RCORE Je UPLE Tree * M XUL DE LU MI IC and AL TO he RE C AN 45 PVE MUTUA FLOOR PLANI *NOX Da INNER ST WW TABRIA TRAC SCC- 45 1 HE * tre 1. 18 SCHNELS LE, Hi, (k ht ESCA E NELS *** INC.NRIS ** LOC Deum: TORTON TO THE STRA WAT IS WEB lo 3. KEMAL NA DUTC Ses 40 L SFP der . WALL Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock