Question: Develop a complete work breakdown structure for a small gas station project for which simplified plans and concept drawings are attached at the end of
Develop a complete work breakdown structure for a small gas station project for which simplified plans and concept drawings are attached at the end of this document . Table 1 provides work unit that need to be finished to complete the project .Develop work packages and include the respective work unit as a secondary level of the WBS . Develop a unique numeric tracking system for work packages and work units . Draw an AON diagram properly sequencing the construction of the primary work packages ( e.g 1st level of the WBS )
what information do need please????
Table 1: Work Units for the Gas Station Project (1) Earthwork for Parking Service (P&S) Area (11) Interior Painting (2) Asphalt Paving for P&S Area (12) Interior Drywall (3) Concrete Hardstands in P&S Area (13) Interior Doors, Frames, Hardware, etc. (4) Concrete Foundations (14) Interior Floor Coverings (if regr'd) (5) Walls-Masonry Bearing Walls (15) Exterior Brick Faade (6) Walls-Prefab Metal Sandwich Panels (16) Exterior Glazing (7) Interior Concrete Floors (17) Exterior Doors and Signage (8) Built-up Roof (18) Mechanical Systems (9) Roof Gutters/Drainage (19) Electrical Systems (10) Interior Built-ins (e.g., Cabinets, etc.) Table 2: Mechanical Systems Individual Work Units (1) Excavation of waste water system (2) Drainage tile installation - waste water (3) Septic tank installation (4) Fresh water lines (piping) (5) Sinks, basins, and toilets installation (6) Hot water system installation (7) Pneumatic air system installation Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
