Question: Develop a purification train for a facility where first process is a perfusion upstream bioreactors 5 0 0 L producing low cell culture titer of

Develop a
purification train
for a facility where
first process is a
perfusion upstream
bioreactors 500L
producing low cell
culture titer of
approx. 0.5g/L
perfusing at 2 VVD
over 30 daysThe current facility has a secondary clarification process for the
perfusate coming from the bioreactor. Secondary depth filtration
clarification capacity of 200 L/m2. Identify the correct filter area, and
system (pump) requirements for the process scale. Also identify
optimal flowrates for flushing and processing, total process time,
buffer volumes required. Assume 10 L/m2 holdup of the depth filters
identify the size of the tank required to collect the filtrate. Average
yield of overall clarification is 80% estimate the titer in the clarified
pool

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Chemical Engineering Questions!