Question: Develop a risk breakdown structure based on the engineering tasks provided in this chart. Demonstrate your understanding of the possible negative risks involved with your

Develop a risk breakdown structure based on the engineering tasks provided in this chart. Demonstrate your understanding of the possible negative risks involved with your project. You may organize the risks using an applicable and logical structure. It should be graphical and easy to understand by a casual observer.

Side Note: this task list provided Develop a risk breakdown structure based on theis about performing engineering services for construction of a Water Supply Well.

Task Description Phase 1: Design Preliminary Design Field Inspection & Verification Mapping & Land Conditions Surveying Draft Drawings Detailed & Final Design Final Drawings Design Calculations Project Manual (Technical Specifications) Phase 2: Permitting SCDOT Submittals (Permitting Agency) Implemment Review Comments SCDHEC Submittals (Permitting Agency) Implemment Review Comments Phase 3: Bidding Bid Advertisement Bid Solicitation Contract Award Activities Preconstruction Conference Phase 4: Construction Periodic Construction Observation Review & Process Contractor's Applications for Paym Submittal Data Review Phase 5: Project Closout Final Site Visit Record Construction Drawings (As Built)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!