Question: Develop a standard time for this job. Prepare a peanut butter and mayonnaise. (Note: Use whipped butter or other spread if peanut allergy is a
Develop a standard time for this job. Prepare a peanut butter and mayonnaise. (Note: Use whipped butter or other spread if peanut allergy is a concern.)
(a.) Lost the steps (elements) required to prepare the sandwich
(b.) Observe the job for several repetitions and make improvements if necessary.
(c.) Time each element for several repetitions.
(d.) Assign a performance rating to the overall job.
(e.) Develop a standard time.
(f.) Determine the output per hour, per day and cost per piece using PHP 373 rate per day.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
