Question: Develop a work breakdown structure (WBS) for a project to build new student housing for 300 students on campus. he WBS should have at a
Develop a work breakdown structure (WBS) for a project to build new student housing for 300 students on campus. he WBS should have at a minimum 5 levels (the project can be the top level) and should cover all areas associated with designing, engineering, constructing, inspecting, and opening the new student housing. The new student housing will have a large fountain, common area, lighting, landscaping, storage units, a gym, and high tech security
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
