Question: Develop the activity sequence model and determine the normal time for the following work activity: A drill press operator reaches 20 cm (8 in.) and

Develop the activity sequence model and determine the normal time for the following work activity: A drill press operator reaches 20 cm (8 in.) and pulls the feed lever down to engage the feed motion, which takes 12 sec.