Question: Develop the activity sequence model and determine the normal time for the following work activity: An assembly worker on a production line obtains an Allen
Develop the activity sequence model and determine the normal time for the following work activity: An assembly worker on a production line obtains an Allen key within reach, positions it 15 cm (6 in.) onto a bolt head, cranks it 7 times to seat the bolt and then sets the key aside.Please give me a detail.