Question: Develop the activity sequence model and determine the normal time for the following work activities 1. A worker walk 4 steps, goes through a door

Develop the activity sequence model and determine the normal time for the following work activities

1. A worker walk 4 steps, goes through a door and walk 6 steps and grasp light piece of wood.

Develop the activity sequence model and determine

No. Method Description Action TMU Sequence Model 1 General A Move Control ABGMX! A Move Tool Use ABG General G A Move Control A B 6 1 A Move