Question: Different techniques for analyzing project risk require different input variables and assumptions. The procedure in which one of the elements (or variables) affecting a projects

Different techniques for analyzing project risk require different input variables and assumptions.

The procedure in which one of the elements (or variables) affecting a projects expected value is changed to study its effect on the expected value is called (A. sensitivity Or B. scenario ?) analysis.

Different techniques for analyzing project risk require different input variables and assumptions.

This curve implies that the project is very sensitive to changes in units sold. The projects NPV is likely to become negative if the number of units sold decreases by (A. 5% Or B. 10% ?).

The procedure in which one of the elements (or variables) affecting a

The expected net present value of the project is .

A.$2.06 million

B.$6.17 million

C.$0.93 million

D.$6.85 million

Standard deviation of the net present value (the NPV of the project is likely to vary by) $ million.

A.10.68

B.9.33

C.9.30

D.10.17

Assuming that probability distribution is normal, the value of z is .

A.0.83

B.0.86

C.0.46

D.-0.66

Thus, the project has a chance to generate an NPV of less than $0.

A.14.46%

B.25.46%

C.32.28%

D.31.21%

Please choose between A,B,C Or D for the question. Thank you for helping me answer this question

Elle is a risk analyst. She is conducting a sensitivity analysis to evaluate the riskiness of a new project that her company is considering investing in. Her risk analysis report includes the sensitivity curve shown on the graph. Along with the sensitivity analysis, Elle is including a scenario analysis for the project in her report, giving the probability of the project generating a negative NPV. Her report includes the following information about the scenario analysis: Complete the missing information in Elle's report: (Note: Round your answers to two decimal places.) Elle is a risk analyst. She is conducting a sensitivity analysis to evaluate the riskiness of a new project that her company is considering investing in. Her risk analysis report includes the sensitivity curve shown on the graph. Along with the sensitivity analysis, Elle is including a scenario analysis for the project in her report, giving the probability of the project generating a negative NPV. Her report includes the following information about the scenario analysis: Complete the missing information in Elle's report: (Note: Round your answers to two decimal places.)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Finance Questions!