Question: Direct materials , 2 6 5 , 2 0 0 l b s , at $ 5 . 5 0 per lb . Direct labor

Direct materials ,265,200lbs, at $5.50 per lb.
Direct labor ,19,500 hrs, at $17.80 per hr.
Rates per direct labor hr., based on 100% of normal
Factory overhead
capacity of 20,350 direct labor hrs.:
Variable cost, $4.80
Fixed cost, $7.60
262,500lbs, at $5.30 per lb.
19,950hrs. at $18.00 per hr.
$92,660 variable cost
$154,660 fixed. Santiago inc's stabdard and actual costs for direct materials, direct labor, and factory overhead incurree fro the manufacture of 78000 units of product were as dollow; requires 0.25 hour of direct labor.
Required:
a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost varlance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Direct Materials Price Variance
Direct Materials Quantity Variance
$
Total Direct Materials Cost Variance
$
$
b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Direct Labor Rate Variance
$
Direct Labor Time Variance
$
Total Direct Labor Cost Variance
$
c. Determine the variable factory overhead controllable variance, fixed factory overhead volume variance, and total factory overhead cost variance.
Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
 Direct materials ,265,200lbs, at $5.50 per lb. Direct labor ,19,500 hrs,

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!