Question: Distribution Centre Design Task 1. This is a group In-Class assignment, which will be assessed (7%). In your group, you are required to produce a

Distribution Centre Design
Task
1. This is a group In-Class assignment, which will be assessed (7%). In your group, you are required to produce a distribution centre design to accommodate the following detailed scenario.
Scenario
Sector Retail
Operating hours 2 shifts, 8 hours a day Mon-Fri, 6.30am 11.30pm
Volumes relatively constant, seasonal 20% peaks in Apr/May and Oct/Nov.
Growth 5% per annum.
Design timeline 5 years
Products 5,000 SKUs
60% Palletized.
Each SKU has 1 pick location and an average 5 replenishment/storage locations.
Each pallet is Standard US (40 inches x 48 inches) built 48 inches high.
30% Shelving. Each SKU has an average dimension of 12 inches x 18 inches x 10 inches and an average quantity holding of 20 items, no replenishment locations.
10% Bulk. Each SKU has an average dimension of 5 feet x 6 feet x 8 feet and an average quantity of 4 items, no replenishment locations.
Storage:
Racking - 5 levels high, 96 inches bay width (2 pallets), and depth is 42 inches with 8 inch gap between back-to-back racking. Assume 200 foot lengths of racking and 13 foot aisle width.
Shelving - 10 foot high, 48 inches deep, configurable shelves. Assume 4-foot walkways between back to back shelving units. Assume 50 foot lengths of shelving
Office Requirements 20,000 sq/ft (Management, HR, Clerical, etc.)
Ceilings 40 foot clear
Aisle widths 13 foot
Walkway widths - 4 foot
Mechanical Handling Equipment:
Pump Jacks 10
Single pallet Walkies 20
Double pallet Walkies 10
Forklift Trucks - 15
Other space considerations:
Battery Changing
Maintenance
Returns/Inspection area
Security
Janitorial
Staff Changing Rooms
Washrooms
Cafeteria
IT
Forklift and MHE parking
Cardboard compactor
Plastic wrap compactor
Trash
Report
2. Submit soft copy to Brightspace (D2L AICE-2: DC Design) by 11.59pm Fri June 9th 2023, the report is to be formatted in Excel, use cells to indicate scale; an Excel file has been attached in the assignments folder for groups to use to provide their solution. Expectations are that the report will provide answers to the fundamental questions:
a. How many square feet does the DC need to be to accommodate peaks and annual growth over the 5 year design timeline (think of the slide in the Warehouse Management PPT); the estimated space requirements for Racking, Shelving, and Bulk should be provided (only consider the actual space for storage, not the walkways and aisles). Show all calculations. ** Hint ** DC size should be somewhere between 500,000 and 1,000,000 sq/ft
b. A DC plan showing the layout of the DC to scale with racking, shelving, and other requirements clearly shown with some commentary on why they have been allocated that space.
Please ensure all group members, that contributed, are identified on the first page with SAIT registration numbers. Standard grading rubric for SCM Case Analysis applies.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!