Question: Distribution Centre Design Task 1. This is a group In-Class assignment, which will be assessed (7%). In your group, you are required to produce a
| Distribution Centre Design |
| Task |
| 1. This is a group In-Class assignment, which will be assessed (7%). In your group, you are required to produce a distribution centre design to accommodate the following detailed scenario. |
| Scenario |
| Sector Retail |
| Operating hours 2 shifts, 8 hours a day Mon-Fri, 6.30am 11.30pm |
| Volumes relatively constant, seasonal 20% peaks in Apr/May and Oct/Nov. |
| Growth 5% per annum. |
| Design timeline 5 years |
| Products 5,000 SKUs |
| 60% Palletized. |
| Each SKU has 1 pick location and an average 5 replenishment/storage locations. |
| Each pallet is Standard US (40 inches x 48 inches) built 48 inches high. |
| 30% Shelving. Each SKU has an average dimension of 12 inches x 18 inches x 10 inches and an average quantity holding of 20 items, no replenishment locations. |
| 10% Bulk. Each SKU has an average dimension of 5 feet x 6 feet x 8 feet and an average quantity of 4 items, no replenishment locations. |
| Storage: |
| Racking - 5 levels high, 96 inches bay width (2 pallets), and depth is 42 inches with 8 inch gap between back-to-back racking. Assume 200 foot lengths of racking and 13 foot aisle width. |
| Shelving - 10 foot high, 48 inches deep, configurable shelves. Assume 4-foot walkways between back to back shelving units. Assume 50 foot lengths of shelving |
| Office Requirements 20,000 sq/ft (Management, HR, Clerical, etc.) |
| Ceilings 40 foot clear |
| Aisle widths 13 foot |
| Walkway widths - 4 foot |
| Mechanical Handling Equipment: |
| Pump Jacks 10 |
| Single pallet Walkies 20 |
| Double pallet Walkies 10 |
| Forklift Trucks - 15 |
| Other space considerations: |
| Battery Changing |
| Maintenance |
| Returns/Inspection area |
| Security |
| Janitorial |
| Staff Changing Rooms |
| Washrooms |
| Cafeteria |
| IT |
| Forklift and MHE parking |
| Cardboard compactor |
| Plastic wrap compactor |
| Trash |
| Report |
| 2. Submit soft copy to Brightspace (D2L AICE-2: DC Design) by 11.59pm Fri June 9th 2023, the report is to be formatted in Excel, use cells to indicate scale; an Excel file has been attached in the assignments folder for groups to use to provide their solution. Expectations are that the report will provide answers to the fundamental questions: |
| a. How many square feet does the DC need to be to accommodate peaks and annual growth over the 5 year design timeline (think of the slide in the Warehouse Management PPT); the estimated space requirements for Racking, Shelving, and Bulk should be provided (only consider the actual space for storage, not the walkways and aisles). Show all calculations. ** Hint ** DC size should be somewhere between 500,000 and 1,000,000 sq/ft |
| b. A DC plan showing the layout of the DC to scale with racking, shelving, and other requirements clearly shown with some commentary on why they have been allocated that space. |
| Please ensure all group members, that contributed, are identified on the first page with SAIT registration numbers. Standard grading rubric for SCM Case Analysis applies. |
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock